Cable bolt trays also require safe operating procedures, if you don’t know, let’s tale a look.
1. All operation control switches before operation should be in the “off” position.
2. The rig legs must be stable and stable during work, and should not be supported on live rafts or materials.
3. Connect the gas and water paths as indicated on the sign, all piping must be kept cleam.
4. Advance speed and propulsion should be moderate, prevent stuck, damage drill pipe drill.
5. When the rig shrinks, do not press your hand on the air leg to prevent it from being squeezedm, it is strictly forbidden to touch the rotating drill pipe by hand.
6. When the rig suddenly clicks, it will generate a large reverse torque, and the operator should carefully operate to prevent sprains.
7. The drill pipe and the rig remain straight during the drilling process.
8. 20# or 30# oil or butter per month in the gearbox, the temperature of the gearbox does not exceed 65 degrees.
9. Leave the drill center line during operation to prevent accidents when the drill rod is broken.
10. Use the operating arm to tighten the bolt nut to make the drilling, mixing and mounting nuts integrated, but the force should be moderate, otherwise the output shaft and the inner hexagonal sleeve will be damaged.
Zongxiang can provide you various cable bolts. You can contact us if you have any demand.
Email: zxminesupport@zxsteelgroup.com
Whatsapp: +86 18236766038
PREVIOUS POST
Split set working principle and characteristicsGet the Price
Online Chat
To top