case
47mm split set stabilizers used for mine support

In underground mining, maintaining the structural integrity of tunnels and passages is crucial to ensuring the safety of workers and the efficient extraction of minerals. One of the most effective methods for reinforcing the ground in these environments is the use of split set stabilizers, also known as friction bolts. These stabilizers are widely used in mining for their simplicity, ease of installation, and reliability. Specifically, 47mm split set stabilizers are frequently used in mines due to their robust performance in providing support in various ground conditions.

 

Design and Construction

A 47mm split set stabilizer consists of a high-strength steel tube that is split along its length, creating a 'C'-shaped profile. This split design is what gives the stabilizer its name. The steel tube is typically cold-drawn, which enhances its mechanical properties such as tensile strength and ductility. The 47mm measurement refers to the outer diameter of the tube, which is designed to fit into a 47mm drilled hole in the rock face.

 

At one end of the split set is a tapered section, often referred to as a pilot point. This taper aids in the insertion of the stabilizer into the drilled hole. As the stabilizer is driven into the hole, the friction between the split set and the rock creates a tight fit, effectively anchoring the stabilizer in place without the need for grout or resin. The other end of the stabilizer features a flange or face plate, which ensures that the stabilizer remains in position and provides additional surface support.

 

Installation Process

The installation of 47mm split set stabilizers is relatively straightforward, which makes them a popular choice in mining operations. First, a hole is drilled into the rock or ground surface, typically using a pneumatic or hydraulic rock drill. The diameter of the hole matches the external diameter of the stabilizer (47mm). Once the hole is prepared, the stabilizer is driven into the hole using a specialized installation tool or a hydraulic jack.

 

As the stabilizer is forced into the hole, the split tube compresses slightly, creating a high level of friction between the stabilizer and the surrounding rock. This friction is what provides the stabilizer’s holding power. The flange at the end of the stabilizer can then be secured against the rock face using a washer or face plate to ensure even distribution of load and support across the surface.

 

The frictional contact generated by the split set is key to its success in underground support systems. The rock mass itself provides the resistive force that holds the stabilizer in place, distributing stress and preventing movement or collapse of the rock surrounding the mining area.

 

Applications in Underground Mining

The 47mm split set stabilizer is a versatile solution that can be used in a wide range of underground mining applications. These stabilizers are most commonly used for ground support in tunnels, drifts, and other excavations where the rock mass needs reinforcement. Their ease of installation and ability to adapt to different ground conditions make them particularly useful in mines with varying geotechnical characteristics.

 

For example, in areas where the rock is relatively soft or fractured, split sets can provide immediate support as they don’t require curing time like grout or resin-based systems. In harder, more competent rock, the high friction between the stabilizer and the rock ensures that the split set remains firmly in place even under significant load.

 

Split set stabilizers are often used in conjunction with other ground support systems, such as mesh, shotcrete, or other types of rock bolts, to create a comprehensive support system. They are also effective in areas with dynamic loads, such as in seismic regions, where they can help absorb energy and prevent damage to underground structures.

 

Advantages of 47mm Split Set Stabilizers

Ease of Installation: The straightforward installation process means that split set stabilizers can be quickly deployed, minimizing downtime in mining operations. Their installation doesn't require specialized resins or grout, which can significantly reduce costs.

 

Adaptability: These stabilizers work well in various ground conditions, from soft or fractured rock to more competent formations. This adaptability makes them suitable for a wide range of mining environments.

 

Cost-Effective: Due to their simple design and quick installation, split set stabilizers are a cost-effective solution for ground support. Their ability to be used immediately without waiting for curing times or the use of additional chemicals also contributes to cost savings.

 

Immediate Load Bearing: Once installed, split sets provide immediate support, which is particularly important in situations where time is critical for ensuring the stability of an excavation.

 

Durability: Made from high-strength steel, 47mm split set stabilizers can withstand substantial loads and are resistant to corrosion, especially when galvanized, making them a durable choice for long-term mining projects.

 

The use of 47mm split set stabilizers in underground mining provides an effective and reliable method for ground support. Their simple design, ease of installation, and adaptability to various ground conditions make them an invaluable tool in the mining industry. By providing immediate reinforcement and distributing load efficiently, these stabilizers enhance both safety and operational efficiency in underground mining projects. Whether used alone or as part of a comprehensive support system, split set stabilizers are a critical component in ensuring the success and safety of mining operations.

Get the Price

Address: No. 1738, 17th Floor, No. 1 Mall, Shangdu Road, Zhengdong New District, Zhengzhou City, Henan Province, China

© 2020 ZXSTEELGROUP