Installing a 39mm split set stabilizer for mine support is a crucial step in ensuring the safety and stability of underground mining operations. This guide will provide you with step-by-step instructions on how to properly install the stabilizer, ensuring effective ground control and reducing the risk of ground failures.
Before starting the installation process, gather all the necessary equipment and tools. You will need a handheld rock drill, split set driver, stabilizer plates, washer plates, and a hammer. Ensure that all equipment is in good working condition and that you have the appropriate personal protective equipment (PPE), including hard hat, safety glasses, gloves, and steel-toed boots. 39mm split set price
Here are the steps for installing a 39mm split set stabilizer:
Step 1: Assess the Ground Conditions
Before installation, evaluate the ground conditions to determine the appropriate spacing and length of the stabilizers. Consider the rock type, anticipated loads, and geological features that may affect stability. Consult with a geotechnical engineer if necessary.
Step 2: Drilling
Using a handheld rock drill, create a hole in the desired location for stabilizer installation. Ensure that the hole diameter matches the size of the stabilizer. Drill the hole to the required depth, taking care to remove any loose debris or cuttings. 39mm split set price
Step 3: Inserting the Stabilizer
Take a 39mm split set stabilizer and insert one end into the drilled hole. Use a split set driver to push the stabilizer into the hole while exerting steady pressure. Ensure that the stabilizer is inserted to the desired depth, leaving a small portion of the stabilizer exposed for later tensioning.
Step 4: Tensioning the Stabilizer
Using a hammer, strike the exposed end of the stabilizer to drive it into the rock. This action will create expansion and generate frictional forces, securing the stabilizer within the hole. Continue striking the exposed end until the stabilizer is tightly wedged in the rock. 39mm split set price
Step 5: Adding Stabilizer Plates
Attach stabilizer plates to the exposed end of the stabilizer. These plates help distribute the load and reinforce the stabilizer's grip on the rock. Slide the stabilizer plates onto the exposed end, ensuring they are properly aligned and seated against the rock surface.
Step 6: Installing Washer Plates
Place a washer plate over the stabilizer plates. Washer plates provide additional support and prevent the stabilizer plates from digging into the rock surface. Install as many washer plates as required, ensuring they are tightly secured against the stabilizer plates. 39mm split set price
Step 7: Repeat the Process
Repeat the above steps for each stabilizer required in the area. Maintain the specified spacing and installation depth to ensure uniform support throughout the mine.
Step 8: Regular Inspection and Maintenance
After installation, regularly inspect the stabilizers for any signs of deformation or movement. Conduct routine maintenance to ensure the stabilizers remain in optimal condition. If any stabilizers show signs of damage or instability, replace them promptly to maintain a safe working environment.
Remember, the proper installation of 39mm split set stabilizers is crucial for effective mine support and ground control. Adhere to safety protocols and guidelines throughout the installation process, and consult with experts or engineers if you encounter any challenges or uncertainties. 39mm split set price
By following these installation steps and prioritizing safety, you can enhance the stability of your mining operations and minimize the risk of ground failures.
Address: No. 1738, 17th Floor, No. 1 Mall, Shangdu Road, Zhengdong New District, Zhengzhou City, Henan Province, China
Email: zxminesupport@zxsteelgroup.com
Tel: +86-199 3712 3680
© 2020 ZXSTEELGROUP